Quoting an automation project you have not built before.
A client wants a number by Friday for something you have never built. The cost is not in the build. It is in the unknowns behind it, and those are discoverable in an hour of questions.
Practical writing on automation delivery, APIs and the operational details that make systems reliable.
A client wants a number by Friday for something you have never built. The cost is not in the build. It is in the unknowns behind it, and those are discoverable in an hour of questions.
Connecting a form to a CRM takes an afternoon. Deduplication, enrichment, routing and assignment are the rest of the project, and they are where the value actually sits.
Automations rarely fail on the day they ship. They fail in week three, when a real person does something the demonstration never did. These are the cases that cause it.
Most automation should stay in a no-code tool. This is how to tell a design problem from a missing connector from a genuine ceiling, and when a migration is not worth doing.
Send us the requirement. We’ll tell you how we’d approach it, what it would require and whether it makes sense to build.
No pitch deck required. A rough description is enough.
Or write to [email protected]